It is with great joy that our all-volunteer-led campaign, having met our fundraising goal, will be issuing a check for

It is with great joy that our all-volunteer-led campaign, having met our fundraising goal, will be issuing a check for
The current GENA 2018 Action Plan: GENA-2018-Action-Plan (5)
On 12/18, the GENA Land use committee held their first meeting and completed a Strength,Weakness, Opportunity, and Threat activity lead
Below are additional designs used for costing analysis for the next phase – architecture & engineering. If you have feedback,
We are proud to announce the Ho-Chunk donation of $10,000 and share the compilation of over 18 months of study
See the engineering assessment and technical evaluation here, along with proposed restoration replacement options: Burbach Tech Eval 6 30 16
See the 5 concepts as well as the complete feasibility report here: Feasibility Study La Crosse 5 18 17
We are proud to announce the draft of our 2017 Neighborhood Plan Update – thanks to all those neighbors, officials
Yesterday’s Pool concepts feedback session was well attended and included a lot of discussion. Thanks to all who came! The
We hope you will carefully consider the future of Memorial Pool tomorrow, May 3rd from 11am-1pm or 6:30pm-8:30pm. We also